|
|
OPERATION
LOOK SEE
Greenland, Fall 1957
|
|
|
|
|
|
|
|
|
|
|
The following excerpts and photos are from the article “A New Chore for the Arctic Sealer” by Jackson L. Morton, Lt. Cmdr, USN., which was published in the Spring 1958 edition of the magazine “Ships and the Sea”. |
|
|
|
|
|
"LOOK at the baby flat-top," cried an alert boy on the waterfront of St. John's as the Arctic Sealer steamed through the Narrows. This ship was a familiar sight in this Newfoundland port that had seen the start of the sealing season for over 100 years. Only last spring she had discharged her catch of sealskins across the harbor on the south side and then paid off her Newfoundland crew. Scarcely had the sealing captain's command of "Double up and secure died out, however, than U. S. Air Force and the Navy's Military Sea Transportation Service representatives from St. John's were looking over this sturdy vessel in Halifax' They wanted to determine her suitability for carrying a helicopter and supporting a survey operation scheduled for arctic waters in late summer. Because of her large open fantail and ice-strengthened constructIon, it became readily apparent that she was well qualified for conversion, which is why she now looks like a baby flat-top. The Arctic Sealer was built for the U. S. Navy during World War II by Snow Shipyards of Rockland, Me., along the lines of a heavy auxiliary net layer, but without the long bow horns and open hawseway typical of the net tenders and cable ships. Her construction was of wood, sheathed with greenheart and ironbark, two of the hardest woods known to man. Her bow and stern were given an extra heavy reinforcing of steel plate that was to serve her well while working in ice sealing in the years to come. Her reliable diesel-electric power plant m took her far into the Pacific conflict as a Navy auxiliary ocean tug, ATA 215. After towing duties during the war, she took Finn Ronne to Antarctica on a two-year surveying expedition for the Navy With her south sea operation over, she was sold by the Navy in 1948 to the highest bidder - Shaw Steamship ii Company of Halifax. Because of her rugged construction and excellent condition, Shaw soon had the largest, fastest and most powerful sealing ship s sailing from St. John's. In 1951 she docked with 37,339 pelts, the high 1 liner for the year. She was written up in the March 1952 SHIPS AND THE SEA. (then called SHIPS AND SAILING). Now, in July 1957, the MSTS had a. new job for her to add to her already colorful history - carrying a survey party to the Arctic after constructing a helicopter pad over her fantail. In order to get the operation under way by early August, conversion and fitting out had to proceed at top speed. Under the experienced direction of John Patterson of the Dartmouth Marine Slip, the Arctic Sealer's profile was changed considerably. The after mast was removed; a 40 x 59-foot landing platform for a 3 ½ ton helicopter was then constructed of steel stanchions and girders with a planked deck. The "pad" was painted the new international orange with a black circle to mark the landing point. A hinged safety net of steel cable and woven manila was made in a sail loft in Halifax and installed for extra protection. Directly over the hatch, a removable 6 x 6-foot section was built so that the after hold could be used for small cargo and to give access to the helicopter from below for fueling hoses. Shaw himself suggested building the pad in sections so that it could be removed and used again. |